10-Foot Extra Long Leader and Extension Hose, 5/8-inch


Price

$12.99

Item # HSE10
Ship Weight 1.71 lbs
Stock Status Out of Stock

Draw your spigot out from behind the bushes and within easy reach.

Provides the reach you need. At a full 10 feet, this leader and extension hose is ideal for use with hose bib extenders and allows you to place hose reels farther from the faucet. 5/8-inch inner diameter. Four-ply hose has a wall thickness of 1/8 inch. Made in the USA.

Product Information


Specs

Ship wt 2 lb Four-ply 5/8" inner diameter Wall thickness of 1/8" 10' long

Customer Reviews


Review Summary

No Reviews

Overall Rating: None

Be the first to review this product